PLM200 Col15 – PS Overview

Notas Curso PLM200
Project System – OCENSA

 

Este documento recopila información de referencia para responder a consultas presentadas durante el curso PLM200 Project System Overview.

En ningún caso representa información que defina el alcance del proyecto, pues ese tipo de definiciones los alumnos deben obtenerlas directamente del equipo y responsables del proyecto SAP de OCENSA.

 

Abrir el siguiente link, bajar el archivo a su PC y luego subirlo en su SAPGui: Favoritos Curso PLM200 Col 15 – Subir en su SAPGui

Links de Info en la WEB

1.      Asset Under Construction through MM

2.      Reports of Assets Under Construction

3.      Settlement Reports

4.      SAP Help – FI-AA Asset Accounting

5.      Asset and Equipment master data sync

6.      Settlement of Asset Under Construction using transaction codes AIAB and AIBU

7.      Bajar Open PS



8.      Step by step configuration for Valuated Project stock

9.      533207 – Valuated and nonvaluated project stock
o aquí: Nota 533207

10.    SAP Project Stock

11.    SAP Plant Stock vs Project Stock

12.    SAP PS Plant Stock Vs Project Stock

13.    Non-Valuated Project Stock: Scenario

14.    Back to Basics: Primary Cost Elements 101

15.    Plan Versions – SAP Help

16.    Different Versions in the Project System

17.    Cost Planning – SAP Help
Ver tx: CJR2


18.    Measurement Methods

BCWS

BCWS is the budgeted costs of work scheduled and corresponds to planned earned value in the Project System. BCWS is a generally accepted term in project management as defined by the United States government in its cost/schedule control system criteria.

BCWP

BCWP is the budgeted costs of work performed and corresponds to earned value in the Project System. BCWS is a generally accepted term in project management as defined by the United States government in its cost/schedule control system criteria.

19.    Earned Value Management and Progress Measurement – SAP Service – PS/PPM

20.    SAP Results Analysis for Beginners

21.    SAP Reconciliation Ledger

22.    Access Control List

23.    PM Integration with PS

24.    Reducing Contract Target Value – When, How, and What to Check Before Releasing

25.    PO Exceeds the Target or Total Value of a Contract – Link 1
PO Exceeds the Target or Total Value of a Contract – Link 2